Abstract

The injection molding machine is one of the supporting tools often used in manufacturing fabrication such as at PT XYZ which is useful in plastic production by means of laborious work of plastic pellets which are then molded according to the company's specific needs. Measuring machine effectiveness using the OEE (Overall Equipment Effectiveness) method through three main components, namely availability, performance, and quality. The level of effectiveness of the Injection machine at PT XYZ measured using the OEE method during the period January–December 2025 showed an average value of 84%, with the highest value of 88% in March 2025 and the lowest 78% in December 2025, so it can be concluded that the machine's performance is slightly below the world class OEE standard of 85%. Meanwhile, the results of the Six Big Losses calculation show that the largest losses that affect the OEE value come from breakdown losses and setup & adjustment losses, which cause a decrease in the availability value, as well as Reduced Speed ​​Losses which reduce the performance value of the Injection machine.

References

Andri, A., & Marikena, N. (2023). Total Productive Maintenance (TPM) Pada Perawatan Mesin Grinding Menggunakan Metode Overall Equipment Effectiveness (OEE) Di PT. Amin Jaya Teknik. Jurnal Teknologi Dan Teknik Industri (JTTI), 1(1), 118-.
Ariyanto, S. (2025). Analisis Overall Equipment Effectiveness (OEE) Dan Total Productive Maintenance (TPM) Pada Mesin Pengupas Kulit Padi Merk Satake Di UD. Sumber Tani. JUSTI (Jurnal Sistem Dan Teknik Industri), 5(2), 5-4.
Atikno, Welly, and H. H. P. (2021). “OEE, Literature Review Tinjauan Literatur Secara Sistematik Tentang Overall Equipment Effectiveness (OEE) Di Industri Manufaktur Dan Jasa.” Journal of Industrial and Engineering System, 2 (1):, 29–39. https://doi.org/10.31599/jies.v2i1.401.
Corrales, Lisbeth del Carmen Ng, María Pilar Lambán, Mario Enrique Hernandez Korner, and J. R. (2020). “Overall Equipment Effectiveness: Systematic Literature Review and Overview of Different Approaches.” Applied Sciences (Switzerland), 10 (18).
Hermanto, M. (2025). Analisis Penurunan Produksi Egrek Pada Mesin Blanking Menggunakan Metode Overall Equipment Effectiveness (OEE) Dan Failure Mode And Effect Analysis (FMEA)(Studi Kasus: PT. Indobaja Primamurni). (Doctoral Dissertation, Universitas Muhammadiyah Gresik).
Muraguchi, A., Hirano, T., Tang, B. O., Matsuda, T., Horii, Y., Nakajima, K., & Kishimoto, T. (1988). The essential role of B cell stimulatory factor 2 (BSF-2/IL-6) for the terminal differentiation of B cells. The Journal of Experimental Medicine, 167(2), 332-344.
Nugroho, Ihsan Hadi, Xander Salahudin, and F. H. (2025). “Optimasi Produktivitas Mesin Microfeed Melalui Pendekatan Overall Equipment Effectiveness ( OEE ): Studi Kasus Di Industri Manufaktur.” 4 (1):, 63–68.
Okafor, Chukwuebuka C., et al. (2024). “Climate change mitigation and adaptation in Nigeria: A review.” Sustainability, 16.16 (202.
Rahmi, J., & Riyanto. (2022). DAMPAK UPAH MINIMUM TERHADAP PRODUKTIVITAS TENAGA KERJA: STUDI KASUS INDUSTRI MANUFAKTUR INDONESIA (The Impact of Minimum Wage on Labor Productivity: Evidence from Indonesian Manufacturing Industry). Jurnal Ekonomi & Kebijakan Publik, 13(1), 1–12.
Reddy, A. S., Reddy, B. A., Reddy, N. P., Reddy, G. S., Balaji, M. N., & Chandra, K. S. (2025). Intelligent Process Monitoring and Predictive Quality Control Using AI Models for Scrap Minimization and OEE Improvement in Digital Manufacturing Systems. In 2025 First International Conference of Advances in Engineering and Computing Technologies for Sus. (pp. 1-5). IEEE.
Salekha, K. E., & Apriliani, F. (2024). Analisis Efektivitas Mesin Extruder1 dengan Metode Overall Equipment Effectiveness (OEE) pada Perusahaan Penghasil Ban di Kabupaten Bogor. Factory. Jurnal Industri, Manajemen Dan Rekayasa Sistem Industri, 2(3), 134-.
Tammya, E., & Herwanto, D. (2021). Analisis Efektivitas Mesin Debarker Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) Di PT. XYZ Kuningan, Jawa Barat. SITEKIN: Jurnal Sains, Teknologi Dan Industri, 19(1), 20-27.
Vijayakumar, S. R., and S. G. (2014). “Improvement of overall equipment effectiveness (OEE) in injection moulding process industry.” IOSR Journal of Mechanical and Civil Engineering 2.10 (2014): 47-60. IOSR Journal of Mechanical and Civil Engineering, 2.10 (2014.